
Hospitality Flooring in the Twin Cities
Hotel renovations run on a 7-year cycle and a RevPAR equation: every room offline is revenue lost. The flooring scope on a 200-room renovation touches guest-room LVT, lobby large-format tile, banquet carpet, restaurant back-of-house resilient, and pool deck restoration — each with different material specs, brand-standard requirements, and scheduling constraints. ATR Floors has been installing commercial flooring for Twin Cities hospitality properties for 30 years, working floor-by-floor and tower-by-tower to keep rooms selling while the renovation progresses.
7-year
Renovation Cycle Aware
Brand-Standard
Marriott, Hilton, IHG, Independents
Phased
Floor-by-Floor Tower Sequencing
Why Hospitality Buyers Choose ATR
Construction noise, adhesive odor, and dust in guest corridors are the three fastest paths to negative online reviews during a renovation. The Clean Slate Process eliminates all three. Guests on adjacent floors do not know the renovation is happening.
Renovation-Window Scheduling
Off-season deep renovations, mid-season floor-by-floor phasing, or tower-by-tower sequencing. We have managed properties from 80-room select-service to 300+ room full-service across the Twin Cities.
Brand-Standard Adherence
Marriott, Hilton, IHG, and independent boutique each publish flooring specs that dictate product, pattern, transition detail, and installation method. We read the brand-standard document and install so your PIP passes review without rework.
Guest-Impact Minimization
Chemical-first removal (no grinding noise), biodegradable formulas (no toxic fumes), and dust-free profiling (no silica in HVAC). Guests on adjacent floors do not know the renovation is happening.
Full-Scope Expertise
Guest-room LVT, lobby 24x48 and gauged porcelain, banquet and meeting carpet tile, restaurant wood or LVT, kitchen and F&B back-of-house resilient and rubber, fitness center rubber, and pool deck concrete — all under one contract.
F&B Back-of-House Specialty
Hotel kitchens, commissaries, and food-prep areas require urethane cement, commercial epoxy, or heavy-duty sheet vinyl. We spec and install the back-of-house systems that hospitality designers often overlook until the kitchen consultant flags it.
Substrate Restoration Before LVT
When 1990s carpet comes up, the slab beneath is rarely ready to accept LVT or tile. Clean Slate Process removes legacy adhesives chemically, profiles the slab, and applies VersaGuard molecular moisture barrier before the new floor goes down.
Why Hospitality Properties Choose ATR
No Dust, No Odor in Guest Corridors
Chemical-first removal and biodegradable formulas protect guest reviews during renovation.
Brand-Standard Compliant
PIP specs read, sourced, and installed to the brand standard — no rework.
Renovation-Window Scheduling
Off-season, mid-season, overnight lobby work — we schedule around occupancy.
F&B Back-of-House Included
USDA urethane cement and commercial epoxy under the same contract as guest-room LVT.
Frequently Asked Questions
Yes. We source to the specific product, pattern, and colorway in your PIP or brand-standard document. If the specified product has a lead time that conflicts with your renovation window, we flag it immediately and work with the brand and your designer to identify an approved alternate before it affects the schedule.
The Clean Slate Process uses chemical-first removal and profiling — no mechanical grinding, no silica dust, no toxic fumes. Biodegradable, low-odor formulas mean no forced ventilation is required. Guests on adjacent floors and in nearby rooms are not affected.
For a standard guest-room LVT installation on a properly prepared substrate, we turn over rooms in 1-2 days including furniture removal coordination. Rooms that require substrate restoration (slab repair, moisture mitigation, leveling) add 1-2 days depending on scope.
Yes. Hotel kitchens, commissaries, and food-prep areas require urethane cement, commercial epoxy, or heavy-duty sheet vinyl — different specs from guest-room and lobby. We install both under one contract so the hospitality GC has a single flooring subcontractor managing the entire scope.
Yes. We coordinate with your interior designer, brand architect, or FF&E procurement firm on material selection, transition details, pattern layout, and installation sequencing. We attend design coordination meetings and provide substrate condition reports that inform material decisions.
Request a Bid for Your Hospitality Project
Full-property PIP renovation, phased floor-by-floor refresh, or restaurant/bar remodel — we walk the site, review the brand-standard spec, and deliver a detailed bid within one business day.
